Going through old folders i stumbled upon these pictures taken when the BETL Electronic City Flyover was still under-construction, with a Single Flyover of 22km long from silk board to Electronic City and adding other 2 flyovers at Bommasandra and Attibele, this is India's Longest Elevated Highway project. The Construction was executed by Soma initially and then NCC, using pre-cast technology.